|
> |
【Delivery of Vessel】 Guang Xi Shi Hua Tuo 1、Guang Xi Shi Hua Tuo 2
On May 15th ,2010, two new built tug boats of PetroChina Guangxi Petrochemical Company, named “Guang Xi Shi Hua Tuo 1”、” Guang Xi Shi Hua Tuo 2” were delivered successfully.
This is the first time we build for CNPC. With the length of 35m, breadth 9.8m, depth 18.2m, speed 13.05knots,registered in CCS, |
Copyright
(C) 2010-2024 zjshipyard.com. All Rights Reserved
ddress:No.8 Jingjiang Road ZhenJiang City Jiangsu Province Tel:0086-511-85637101 85637218 Fax:0086-511-85637107 |