HOME PAGE |  SERVICES |  CONTACT
>

【Delivery】Our company successfully delivered two ASD tugboats

    On 1st December, 2021, two units of 3,680kw ASD tugboats, which are built for  Zhoushan Haitong and named “ZHOU GANG TUO 39”and “ZHOU GANG TUO 41”, have completed and delivered.
    The ship “ZHOU GANG TUO 39”has a total length of 39.975m, a width of 10.6m, a depth of 4.9m, bollard pull (stern) of 64t,  bollard pull (forward) of 58t, a an endurance of 1100nm and a speed of 13.24Kn.
    The ship “ZHOU GANG TUO 41”has a total length of 41.225m, a width of 11.5m, a depth of 5.3m, bollard pull (stern) of 86t,  bollard pull (forward) of 77.1t, a an endurance of 1100nm and a speed of 13.8Kn.

Copyright (C) 2010-2025 zjshipyard.com. All Rights Reserved 
ddress:No.8 Jingjiang Road ZhenJiang City Jiangsu Province  Tel:0086-511-85637101 85637218  Fax:0086-511-85637107